Study on M/M/1 Queueing Netwօrk with Preparatory Wօrk and Feeback using Three Nodes when Catastrophe Occurs
Main Article Content
Abstract
In this paper we study M/M/1 open queueing network with instantaneous Bernoulli feedback and preparatory work with three nodes when catastrophe occurs. We derive n number of customers in the system, queue length (all three nodes), system length and system time. The numerical examples are given to test the feasibility of the model.
Article Details
Issue
Section
Articles